Energy efficiency at the Parc Hotel

Sustainable and innovative tourism
The Parc Hotel Du Lac in Levico Terme has chosen 2G Italia's g-box 20 to improve energy efficiency and reduce operating costs. This innovative CHP supports the hotel's heating and utilities, contributing to a more sustainable management of resources.

Facts & figures

Application:
Hotels and resorts
Country:
Italy
Output el/th (kW):
20 kWel / 44 kWth
Operator:
Parc Hotel Du Lac

The cogeneration project

 

In line with its sustainability mission, the Parc Hotel Du Lac has recently invested in the installation of a g-box 20 cogenerator from 2G Italia. With an electrical output of 20 kW and a thermal output of 44 kW, the g-box 20 is an advanced technological solution for energy efficiency.

 

This compact unit has been integrated into the hotel's engine room, in parallel with other air-conditioning equipment, including gas boilers and chillers for cooling. This synergistic configuration ensures optimal management of energy resources, contributing to a more rational and sustainable use of energy.

 

The installation of the g-box 20 has been managed to ensure maximum operational efficiency and integration with existing systems. The combined heat and power unit is able to supply heat and electricity continuously, optimising the use of resources and minimising waste. This project reflects Parc Hotel Du Lac's commitment to pursuing operational excellence and environmental sustainability.