Starting 2024: Hydrogen Reaches Heek via Pipeline

31 maggio 2022

Across Europe, the planning and construction of the "hydrogen backbone" are well underway. Consequently, the GET H2 Nukleus pipeline from Lingen to Gelsenkirchen, which is part of a project carrying the same name, will be operative no later than 2024. The 2G headquarters in Heek being located directly next to the planned pipeline means that the headquarters will be connected to the hydrogen network in about two years! An impactful decision for the future that will raise the 2G technology campus to a new level. The West German Broadcasting Network (WDR) has recently published a segment on this topic:

 

Watch the video

ULTERIORI INFORMAZIONI

Newsletter 2G

Iscriviti alla nostra newsletter per ricevere tutte le novità importanti su 2G e sul mondo della cogenerazione.

Rassegna stampa

Leggi cosa dice la stampa su 2G e sulla nostra efficiente produzione di energia elettrica e termica.