CHP for UK papermill

25 maggio 2022

Fourstones Sapphire Paper Mill in Glenrothes, Fife were looking at ways to reduce both their energy costs and operational costs, our 2MW containerized CHP alongside an additional 1 MW steam generator was the perfect solution for this. The combination of CHP with the steam generator ensures that the power, steam, and hot water are all delivered. A key benefit to this project is the hot water, which stabilized the paper mill’s boiler feed system, this was a real problem for the business. Watch the full project video to find out how this was achieved.

 

Click here to watch the video

ULTERIORI INFORMAZIONI

Newsletter 2G

Iscriviti alla nostra newsletter per ricevere tutte le novità importanti su 2G e sul mondo della cogenerazione.

Rassegna stampa

Leggi cosa dice la stampa su 2G e sulla nostra efficiente produzione di energia elettrica e termica.