CHP saves energy costs for London hospital
Royal Marsden NHS trust required significant energy cost savings for their new emergency department
Royal Marsden NHS trust is building a new Emergency Department and the precondition to the planning approval was the installation of a CHP.
The main benefits to a CHP solution the Trust envisaged were:-
- Increased operational efficiency and reduced energy costs.
- Environmental benefits with reduced CO2 emissions.
- Improved security of energy supply
A CHP solution therefore represented a significant contribution to their targets and is part of an overall programme of saving initiatives.
Facts & figures
Application:
Health and care
Country:
Wielka Brytania
Output el/th (kW):
1.5 MW electrical
Operator:
Royal Marsden NHS